Home / Services / Project Management
Tooling Project Management

Your eyes and hands on the shop floor in China

We manage your mold project from kickoff to shipment — following progress, leading trials, inspecting the tool against your specification and getting it safely to your plant.

Why it matters

Distance should not mean losing control

Our project managers are the bridge between you and the toolmakers. They protect your interests from project start to final delivery and after-sales, communicate fluently in English and bring years of hands-on mold project experience.

We manage tools built through the GTS network — and we can also look after projects with toolmakers you already work with in China.

  • Single point of contact in English
  • Weekly reports with photos — no surprises
  • On-site presence at trials and buy-off
  • Issues escalated early, with a proposed fix
Injection mold opened for inspection
What we do

Every stage, covered

Kickoff & planning

DFM and CAE review, mold drawing review, steel and hot runner ordered only after your approval, and a fixed mold schedule.

Progress follow-up

Weekly process reports, digital photos of each component's status and steel measurement reports — so you always know where the tool stands.

Mold trials

We lead T0/T1 trials at a professional trial facility, review part defects and agree tuning actions with you. Sample parts shipped on request.

Mold buy-off

Part dimensional measurement reports, follow-up of the mold C-run and a final check of the tool against your specification.

Packing & shipment

Treated wooden crates, vacuum packaging, logistics coordination and all export documents.

After-sales support

Technical assistance once the tool is in production — spare parts, modifications and troubleshooting.

Quality control

Every component inspected

Our component manufacturers provide CMM inspection reports after machining is complete. We coordinate the inspection documentation and share the reports with you for review.

  • CMM inspection of critical components
  • Steel measurement reports during build
  • Part dimensional reports after each trial
  • Final check against your specification
CMM inspection room Precision micrometer CMM measurement program
Transparency

What lands in your inbox

Weekly report

Status of every component against the agreed schedule.

Progress photos

Digital photos of machining, fitting and assembly each week.

Measurement data

Steel measurement and part dimensional reports.

Trial summary

Trial results, defects found and agreed tuning actions.

Have a tooling project in China that needs an owner?

Whether the mold is built through GTS or by your existing supplier, we can follow it for you.